Decision-support tool for scheduling activities with stochastic durations in project networks

Show simple item record

dc.contributor.author Fernandez, Francisco Quiroga en
dc.date.accessioned 2008-10-03T03:13:17Z en
dc.date.available 2008-10-03T03:13:17Z en
dc.date.issued 2004 en
dc.identifier.issn THESIS en
dc.identifier.uri http://hdl.handle.net/2292/3073 en
dc.description Restricted Item. Print thesis available in the University of Auckland Library or may be available through Interlibrary Loan. en
dc.description.abstract A decision-support tool is designed and developed in the Visual Studio.Net environment. The tool allows managers to model project networks and schedule start times of stochastic activities. The project faces linearly increasing holding costs and delay penalties. Start times are generalized from the single-period newsvendor model in two ways: 1) non-final parallel activities are coordinated to balance the expected holding costs resulting from either finishing early and having to wait for other parallel activities, or from finishing late and making other parallel activities wait; 2) final actives are coordinated to balance the expected holding costs resulting from completing an activity before the output can be shipped, and the expected delay costs resulting from completing the project after the due date. The tool uses spreadsheet heuristics and simulation to coordinate non-final activities, estimate the probabilistic distribution of the maximum duration of parallel activities, estimate the probabilistic distribution of the duration of the sum of successive activities and coordinate final activities. The performance of the heuristics is compared to exact solutions obtained in Mathematica 5 using numerical integration. The divergence between the heuristic and the more exact solutions is found to be small and to follow distinct patterns. en
dc.publisher ResearchSpace@Auckland en
dc.relation.isreferencedby UoA1443569 en
dc.rights Restricted Item. Print thesis available in the University of Auckland Library or may be available through Interlibrary Loan. en
dc.rights.uri https://researchspace.auckland.ac.nz/docs/uoa-docs/rights.htm en
dc.title Decision-support tool for scheduling activities with stochastic durations in project networks en
dc.type Thesis en
thesis.degree.grantor The University of Auckland en
thesis.degree.level Masters en
dc.rights.accessrights http://purl.org/eprint/accessRights/ClosedAccess en
dc.identifier.wikidata Q112859713


Files in this item

Find Full text

This item appears in the following Collection(s)

Show simple item record

Share

Search ResearchSpace


Browse

Statistics