Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules

Show simple item record

dc.contributor.author Lan, W-M en
dc.contributor.author Lennon Olsen, T en
dc.date.accessioned 2011-11-09T00:15:06Z en
dc.date.issued 2006-05 en
dc.identifier.citation Operations Research 54(3):505-522 May 2006 en
dc.identifier.issn 0030-364X en
dc.identifier.uri http://hdl.handle.net/2292/8828 en
dc.description.abstract This paper considers a multiproduct, single-server production system where both setup times and costs are incurred whenever the server changes product. The system is make-to-order with a per unit backlogging cost. The objective is to minimize the long-run average cost per unit time. Using a fluid model, we provide a closed-form lower bound on system performance. This bound is also shown to provide a lower bound for stochastic systems when scheduling is local or static, but is only an approximation when scheduling is global or dynamic. The fluid bound suggests both local and global scheduling heuristics, which are tested for the stochastic system via a simulation study. [ABSTRACT FROM AUTHOR] en
dc.description.uri http://pubsonline.informs.org/doi/abs/10.1287/opre.1060.0298 en
dc.language EN en
dc.publisher INFORMS: Institute for Operations Research en
dc.relation.ispartofseries Operations Research en
dc.rights Items in ResearchSpace are protected by copyright, with all rights reserved, unless otherwise indicated. Previously published items are made available in accordance with the copyright policy of the publisher. Details obtained from http://www.sherpa.ac.uk/romeo/issn/0030-364X/ en
dc.rights.uri https://researchspace.auckland.ac.nz/docs/uoa-docs/rights.htm en
dc.subject SIMULATION methods en
dc.subject COST control en
dc.subject SYSTEM analysis en
dc.subject OPERATIONS research en
dc.subject QUEUING theory en
dc.subject PRODUCTION (Economic theory) en
dc.subject STOCHASTIC systems en
dc.subject production/scheduling: stochastic sequencing en
dc.subject queues: limit theorems en
dc.title Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules en
dc.type Journal Article en
dc.identifier.doi 10.1287/opre.1060.0298 en
pubs.issue 3 en
pubs.begin-page 505 en
pubs.volume 54 en
dc.rights.holder Copyright: 2006 INFORMS en
pubs.author-url http://search.ebscohost.com/login.aspx?direct=true&db=buh&AN=21275688&site=ehost-live en
pubs.end-page 522 en
dc.rights.accessrights http://purl.org/eprint/accessRights/RestrictedAccess en
pubs.subtype Article en
pubs.elements-id 167872 en
pubs.org-id Business and Economics en
pubs.org-id Faculty of Bus. & Eco Admin en
pubs.org-id Faculty of Bus. & Eco Admin en
dc.identifier.eissn 1526-5463 en
pubs.record-created-at-source-date 2010-10-28 en


Files in this item

Find Full text

This item appears in the following Collection(s)

Show simple item record

Share

Search ResearchSpace


Browse

Statistics